CNH T8000 — DIFFERENTIAL

Section 21 - Transmission, Drivelines - Chapter 8 STEP 9 STEP 11 26s27b While supporting the vertical lifting link, drive out the hitch swivel pin with a suitable tool. Repeat Steps 9 through 11 for the other vertical lifting link. 76-6a Remove the bolt and locking flag plate in the upper end of the hitch lift cylinder (both sides). STEP 12 NOTE: Be prepared for the sudden drop in the vertical lifting link as the pin is driven out. STEP 10 35-24 Secure the rockshaft assembly as follows: 1. Attach a chain hoist to the top of the rockshaft assembly. 27s12b Remove the hydraulic lines to the hitch lift cylinder as follows: 2.

Place enough tension on the chains to support the assembly without adding a lifting force. 1. Be prepared to catch hydraulic fluid as the hydraulic system is opened. 2. Remove the hydraulic line from the top of the hitch lift cylinder and then from the bottom of the hitch lift cylinder (both sides). 21-8-5