CNH T8000 — PINION SHAFT

Section 21 - Transmission, Drivelines - Chapter 8 STEP 77 STEP 79 T95923 Measure the distance from the bearing cone to the front of the snap ring groove using feeler gauges. T95935 Backseat the front bearing on the snap ring with 10,000 to 15,000 lb. of force. Check the end play again. The end play must be from 0.013 to 0.102 mm (0.0005 to 0.004 inch). If the end play is incorrect, install the correct size snap ring (larger or smaller) to obtain the correct end play. STEP 78 It may be necessary to make calculations to determine the force to use with your ram. See “How to Determine Ram Pressure” below. T95934 1060L9 Determine pinion shaft bearing end play as follows: 1.

Mount the bearing cage in a vise. 2. Attach a dial indicator on the bearing cage so that it indicates from the end of the pinion shaft. 3. Measure the end play by pushing on the shaft with 50 to 100 lb. of force. T95933 Select a snap ring with a thickness between 0.05 mm (0.002 inch) less than your measurement to 0.007 mm (0.003 inch) more than your measurement. If more than one ring can be used, install the thicker ring in the pinion shaft groove. 4. Record the indicator reading while slightly oscillating the shaft. 5. Repeat the procedure in the opposite direction. The difference between the two readings is the pinion shaft bearing end play. 21-8-18