CNH T8000 — DIFFERENTIAL INSTALLATION

Section 21 - Transmission, Drivelines - Chapter 8 STEP 121 STEP 123 T98192 Install two aligning dowels in each bearing retainer mounting surface of the rear frame. T98193 Install bearing retainers as follows: 1. Align the lube passage on the rear frame housing with the lube passage in the bearing retainer (shown). STEP 122 2. Install the bearing retainers on the rear frame housing. 3. Gradually and evenly torque the retainer mounting bolts to 235 to 260 Nm (173 to 192 lb. ft.). NOTE: If the differential bearings were changed, the backlash on the ring and pinion must be set. See Adjusting the Ring and Pinion Backlash in this section. STEP 124 T98199 Install shims as follows:

Install the Diff Lock supply line, Diff Lube line, rear frame cover, and PTO assemblies that were removed. Install rear frame top cover. 1. If no changes were made with the differential bearings, install the original shims back in their original locations at each bearing retainer. Check differential rolling torque. STEP 125 2. Check the backlash on the ring and pinion and adjust if necessary. 3. When new bearings are installed or the housing is replaced, the new shim pack dimension determined by the preload adjustment procedure must be used. Install half the shim pack under each bearing retainer (see Adjusting Differential Preload, beginning at Step 148). 4.

Make sure that the lube passages in the rear frame align with the proper hole in each shim (see Step 122). 35-14 With a 3-point sling and hoist, lift the rockshaft casting into place. 21-8-30