CNH T8000 — DIFFERENTIAL INSTALLATION

Section 21 - Transmission, Drivelines - Chapter 8 STEP 138 STEP 141 26s24b Insert the slotted end of a locking flag plate into the groove on the inside of the hitch swivel pin. 91s16 Install and tighten the rear frame drain plug in the housing. STEP 139 STEP 142 Install the drawbar on the tractor and secure with the pin. Torque the pivot pin retaining bolt to 125 to 150 Nm (93 to 112 lb ft). Refer to Tractor Hitch in this manual for details. STEP 143 Install the brake cylinders onto the tractor. STEP 144 26s21b Install the hex-head bolt and tighten it to a torque of 82 to 106 Nm (60 to 78 lb ft). Repeat for the other vertical lifting link.

Install the axle shafts and planetaries on the tractor. STEP 145 Connect the range transmission and the rear frame together (refer to Range Transmission to Differential Split in this manual). NOTE: Refer to Tractor Hitch in this manual for details about orienting the links in the three-point hitch if they were removed. STEP 140 STEP 146 Install the fuel tank on the tractor. When the rockshaft is fully assembled, calibrate the hitch (see Hitch Controller Calibration and Fault Codes in this manual for the procedure). STEP 147 After filling the transmission, operate the tractor for a few minutes. Shut down and check the transmission fluid level.

STEP 148 If not already performed, calibrate the hitch (see Hitch Controller Calibration and Fault Codes in this manual). 21-8-34