CNH T8000 — Assembly

Section 25 - Four-Wheel Drive Front Axle - Chapter 11 STEP 57 RD02M058 Apply grease to the housing bore. RD02M104 The following parts are assembled in locations “A” and “O”. STEP 58 STEP 61 RD02M059 Install the cylinder mounting pin into the bore. RD02M062 Apply Loctite 609 to the OD of the new bushing. STEP 59 STEP 62 RD02M060 Install the shoulder bolt. Tighten to a torque of 27 to 30 Nm (20 to 22 lb. ft.). RD02M063 Place the cradle on a press. Press the bushing into the bore using appropriate drivers. 25-11-15 STEP 60 A O