Section 31 - PTO - Chapter 2 STEP 104 Press bearing onto the output sleeve shaft. Be sure the bearing is fully seated. IMPORTANT: Do not press on the bearing cage as permanent damage to the bearing will occur. STEP 105 RD05B022 Press bearing cone into housing. Be sure cone is fully seated. IMPORTANT: Before final reassembly, the rolling torque needs to be checked. See Reversible PTO Output Shaft Bearing Adjustment Section. 83LS3 STEP 106 Apply grease to the splines and install the output shaft sleeve. IMPORTANT: USE ONLY Multi-Purpose #2 Lithium Grease Grade 251H EP. STEP 107 RD05A059 Place a bead of Loctite® 515 around the sealing surface of the housing cover. NOTE:
Make sure the Loctite® is applied around each bolt hole. RD05A060 31-2-36