. ATTACHMENTS, OPTIONS HANDLING HYDRAULIC RIPPER ATTACHMENTS, OPTIONS HANDLING HYDRAULIC RIPPER shank hole, then 6 - 7 When c hanging the digging depth, do as f ollows. 1. Remov e cotter pin (1). 2. Remov e pin (2 insert p in (2). 3. Insert c otter pin ADJUSTING DIGGING ANGL Adjust t he p osition of the mounting pin hole in the bea m and upper link. Digging Position Position (1): 45° (2): 55° The pin is l ocked w ith lock p late (3). REPLACEMENT OF POINT A point is in stalled t o protect the shank . If th e poin t is w orn, replace it as follows . 1. 2. 3. 1. Put a p in remo ver in contact with t he p in marked b y the arrow and tap with a hammer to remove. 2. Replac e the po 3.
Insert t he pin h alf way, t hen knock it in fully with a hammer.