LUBRICATION 4.7 MAINTENANCE PLAN 4.7.1 WHEN REQUIRED 4.7.2 MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER (BREAKER) 4.7.3 CHECKS BEFORE STARTING 4.7.4 MAINTENANCE EVERY 100 HOURS OF OPERATION 146 N. PART OPERATION PAGE a Cooling circuit Wash 149 b Fuel tank Drain the condensate 150 c Electrical system Check 150 d Steel tracks Check and adjust the tension 151 e Rubber tracks Check 153 f Rubber tracks Check and adjust the tension 155 g Rubber tracks Change 157 N. PART OPERATION PAGE a Hydraulic oil filter Change the cartridge 159 b Hydraulic oil tank Change the oil 159 N.
PART OPERATION PAGE a Various checks — 160 b Coolant Check and top up 160 c Fuel tank Check and top up 161 d Engine oil pan Check and top up 161 e Hydraulic oil tank Check and top up 162 N. PART OPERATION PAGE a Joint and ball-bearing ring articulations Lubricate 163 b Variable track gauge sliding guides Lubrication 164 c Air cleaner Clean the cartridge 165