MAINTENANCE PLAN 4.7.4 MAINTENANCE EVERY 100 HOURS OF OPERATION 4.7.4.a LUBRICATING THE JOINTS AND THE BALL-BEARING RING 163 IMPORTANT • Clean the grease nozzles before applying the greasing pump. • After lubrication, remove any excess grease. • If the machine is used in difficult conditions, perform this maintenance operation more frequently. These maintenace operations must be carried out with the equipment completely extended and resting on the ground. For the lubrication, use a syringe and the prescribed grease. (See “4.3 FUEL, COOLANT AND LUBRICANTS”).
IMPORTANT • When injecting grease to lubricate the rotation pinion and the ball-bearing ring, rotate the upper struc- ture slowly and grease every 90°. 2 1 4 3 RWA06130 1 - Ball-bearing ring (1 point) 2 - Ball-bearing ring pinion (1 point) 3 - Tie rod-bucket coupling pin (1 point) 4 - Bucket fulcrum pin (1 point)