3.
BOOM PRIORITY SYSTEM ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER SWING MOTOR ps1 T3 T4 ps2 T1 T2 TRAVEL MOTOR pa11 pa10 DR1 pc1 B9 A9 TURNING JOINT ARM2 pb9 pc1 pa5 (34,2) B8 A8 pa9 (34,1) P2 BUCKET DR2 pa11 pb8 pa8 pc2 A7 B7 pc2 BOOM1 pb3 pb7 pa3 pa7 pc7 B6 pc6 TRAVEL-RH pb6 A6 pa6 STRAIGHT TRAVEL RCV PEDAL P T TRAVEL P2 P3 pa6 pb6 pb1 pa1 (4) (1) (2) (3) A1 A2 SWING ARM BUCKET BOOM P T P T Dr#, dr# FRONT PUMP REAR PUMP PILOT PUMP (4) (1) (2) (3) (4) (1) (2) (3) Pk (T/Joint) PH (MCV) a b d e f g h j c d1 h1 PS PS PS A5 A1 A2 A3 P4 PG (S/Motor) pb5 pa2 pb2 pa9 pb8 pa8 pa7 pb7 h2 T(dr1) P3 P2 P1 PP(MCV) HYDRAULIC TANK RELIEF VALVE LINE FILTER 900L3HC04 When carrying out the combined operation of swing and boom up, the boom up operating speed is lowered then normal operation.
To increase working efficiency, swing speed reducing system is used. When the RH control lever is pulled back to the boom up position, the pilot oil from pilot pump flow into Pc6 port in main control valve through pa7 port. Pc6 oil pressure moves swing reducing spool to upper direction and oil flow rate to the swing motor decreased. Then, the boom up speed is increased. This is called the boom priority system. 3-8 B5 A5 pb pb5 9 ARM1 p B B A A D p p a5 PO B4 A4 1 OPTION 1 R7 c7 A3 B3 b3 B2 pa3 BOOM2 A2 pb2 SWING DR3 pa2 pc6 B1 A1 pb1 pa1 TRAVEL-LH pr1 P1 PSPT PP PA PH SH PS