Komatsu — LIFTING MACHINE

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 138 1. Pass wir e ropes bet ween th e 1st an d 2nd track r ollers from the front and between th e 1st a nd 2nd t rack rollers from the rear. However , for machin es equipped wi th a f ull rolle r guard for the track roll er, pass the wire ro pe unde r the track. The mar shows th k for the c e position enter of of the gravity center e right. shown in the diagra m on th 3. Set the li fting angle e wire r ope to 30° to 40 the mach ine slowly. 4. After the machine and wait slowly. comes operation machin machine The lif ting load is 35 tons hen lift