Komatsu — EVERY 1000 HOURS MAINTENANCE

. MAINTENANCE MAINTENANCE PROCEDURE 4 - 68 CHECK ALL TIGHTENING POINTS OF ENGINE EXHAUST PIPE CLAM Please ask y our Komatsu distri butor to c heck th e tighten ing of the clamps betw een the air cleaner - turbocharger - aftercooler CHECK WELDED STRUCTU (Color check Cracks in we lded structures can be seen easily with a col or check. Check the rev olving f rame, center frame, boom, and arm eve ry 1000 hours. I n particular, carry out a color ch eck on t he important che ck points (marked with a circle). The procedu re for the color che ck is as f ollows. 1. Prepare the materials need ed for the color c heck. (D etergent, penetrating ag ent, developing solution) 2.

Spray wi th detergent and w ash to remove a ll the dirt and oil from the place t o be checked 3. After wa shing, dry the area, then spr ay with penetrati ng agent and leave for 5 - 20 minutes. 4. Spray wi th detergent, then c lean the surface with a c 5. Clean th e surface again, the n spray with de veloping 6. Leave fo r 15 - 20 minutes, t hen chec k visua lly for cra re any cracks, colo r can be seen. 7. If there a re any cracks, carr y out the repair procedur e to repair