Freightliner — Freightliner Business Class M2 Workshop Manual

Hydraulic Brake System, Bosch 42.15 Hydro-Max ® II Power Brake Booster Removal and Installation 1 2 f420704 07/26/93 2. Install the four mounting hexbolts and washers. See Fig. 4 . Tighten to 27 lbf·ft (37 N·m). Fig. 5, Power Brake Booster Removal f420703b 02/12/2002 1. Supply Line (steel) 2. Return Line (rubber) 3. Install the master cylinder on the power brake booster, following the instructions in Sub- ject 140 . Fig. 3, Power Brake Booster Lines (actual appearance may vary) 4. Connect the hydraulic supply and return lines See Fig. 3 . Tighten the supply line to 21 lbf·ft (28 N·m). Tighten the hose clamp on the return line firmly. 5.

Connect the wiring to the backup pump assem- bly and to the flow switch assembly. See Fig. 2 . 6. Check the ATF level in the power steering reser- voir See Fig. 6 . Add approved ATF if needed. See Specifications 400 for the approved ATF. 7. Connect the batteries. 8. Bleed the power brake booster following the in- structions in Subject 110 . 9. Close and latch the hood. f430297 02/12/2002 Fig. 4, Power Brake Booster Mounting (actual appearance may vary) 10. Remove the chocks from the rear tires. Business Class M2 Workshop Manual, Supplement 5, September 2003 150/2