Quick Release Valve 42.21 Operating and Leakage Tests Operating and Leakage Tests WARNING Before working on or around air brake systems and components, see Safety Precautions 100 . Failure to do so may result in personal injury. The following tests should be performed after repair- ing or replacing the quick-release valve to ensure that it is functioning properly. 1. Park the vehicle on a level surface and set the parking brakes. Shut down the engine. Chock the tires. 2. Drain the air system. 3. Release the parking brakes. 4. On QR-1C valves, remove the air line from the valve balance port. Build system air pressure to 120 psi (827 kPa).
Coat the exhaust and balance ports with a soap solution; leakage of a 1-inch (2.5-cm) bubble in 5 seconds at either port is allowable. Install the air line at the balance port. 5. Apply the parking brakes. Step on the foot brake; the valve should exhaust air at the exhaust port when the foot brake is released. 6. Drain the air system. 7. Remove the air line from the valve supply port. Build system air pressure to 120 psi (827 kPa). With the foot valve depressed, coat the supply port and the seam between the body and cover with a soap solution; leakage of a 1-inch (2.5- cm) bubble in 5 seconds at the supply port is allowable. No leakage between the body and cover is permitted.
Install the air line at the sup- ply port. 8. If the valve does not function properly, or if leak- age is excessive, repair or replace it following the instructions in this section. 9. Remove the chocks from the tires. Business Class M2 Workshop Manual, Supplement 0, January 2002 110/1