Tractor Protection Valve, Bendix TP–3DC 42.25 Operation and Leakage Tests Leakage Test IMPORTANT: Before working on or around air brake systems and components, review Safety Precautions, 100 . 1. Chock the tires, start the engine, and run it until the air system is fully charged. 2. Shut down the engine and place the trailer air supply valve in the emergency position (red knob pulled out). 3. Disconnect the trailer control line hose coupling. Then make a service application with either the foot valve or trailer control valve and check for leakage at the hose coupling with a soap and water solution. Leakage should not exceed a 1-inch (2.5-cm) bubble in 5 seconds. 4.
Release the service brake application and place the trailer supply valve in the "run" position (red knob pushed in). Connect the trailer control cou- pling to a test gauge. 5. Make a service brake application and note that service air pressure is present at the trailer con- trol line hose coupling. 6. With the ignition on, make and hold a service brake application and note that the stop lights function. 7. Disconnect the air line at the TP–3DC tractor control port (primary) and plug the line. Using a soap-and-water solution, make a service brake application and check for leakage at the open tractor control port. Leakage should not exceed a 1-inch (2.5-cm) bubble in 5 seconds. 8.
Reconnect the air line to the tractor control port (primary) and disconnect the air line at the trac- tor control port (secondary). Then, plug the dis- connected line. Make and service brake applica- tion and check for leakage at the open tractor control port using a soap-and-water solution. Leakage should not exceed a 1-inch (2.5-cm) bubble in 5 seconds. IMPORTANT: If the valve does not function as described, or if leakage is excessive, repair or replace the valve. 9. Remove the chocks. Business Class M2 Workshop Manual, Supplement 0, January 2002 110/1