Freightliner — Freightliner Business Class M2 Workshop Manual

Power Steering Gears, TRW THP/PCF Models 46.05 Input Shaft Seal Replacement 17.2 Apply Exxon Polyrex EP2 grease to the new dirt and water seal and install it on the input shaft. See Fig. 7 . Seat it in the groove behind the serrations and against the valve housing. Wipe any excess grease from the valve housing bore and input shaft once the seal has been installed. A f460580a 03/10/94 A. Seat the seal here. Fig. 7, Dirt and Water Seal Installation 18. Using a new pinch bolt and nut, attach the steer- ing driveline to the input shaft. Tighten the nut 30 to 35 lbf·ft (41 to 47 N·m). 19.

Apply torque seal, OGP F900WHITE, to the ex- posed bolt threads and the nut to indicate the fasteners have been properly tightened. 20. Connect the return line to the steering gear re- turn port. 21. Bleed the air from the system. For instructions, see Subject 110 . Business Class M2 Workshop Manual, Supplement 20, September 2011 120/3