Freightliner — Freightliner Business Class M2 Workshop Manual

Fuel Tanks and Fuel Lines 47.00 Tank-Mounted Step Assembly Removal and Installation the procedure for the bottom step of the two- step installation. 1. Install a step riser on each tank bracket. 1.1 Position a riser on each bracket, as shown in Fig. 3 . 1.2 Install the 3/8–16 mounting bolts, locknuts, and washers, as removed. Leave the fas- teners finger-tight. 1.3 When all the risers have been installed, tighten the locknuts 28 lbf·ft (38 N·m). 2. Install the bottom step on the risers, if removed. 2.1 Position the bottom step on the risers, as shown in Fig. 2 . 2.2 Install the 1/4–20 machine screws, lock- nuts, and washers on the step, as re- moved. Leave the fasteners loose. 3.

Install the top step on the fuel tank. 3.1 Position the top step on the braces welded to the fuel tank bands, as shown in Fig. 1 . 3.2 Install the 1/4–20 machine screws, lock- nuts, and washers on the step, as re- moved. Leave the fasteners loose. 4. Tighten the step locknuts 72 lbf·in (800 N·cm). Business Class M2 Workshop Manual, Supplement 1, April 2002 100/2