Freightliner — Freightliner Business Class M2 Workshop Manual

Fuel Tanks and Fuel Lines 47.00 Fuel System Priming Priming 2. On Caterpillar engines, if the engine is equipped with a priming pump, use it to prime the fuel transfer pump. Before priming the system, make sure there is enough fuel in the tank(s). Don’t fill them to more than 95 percent of capacity. 2.1 Operate the priming pump plunger until there is resistance. WARNING 2.2 Start the engine; if it doesn’t start, more priming is needed. Once the engine has started, it may run rough; if so, run the engine at low idle until it runs smoothly. Federal regulations prohibit filling a fuel tank to more than 95 percent of its capacity.

A tank with air space is much less likely to rupture in an ac- cident than one that has little or no air space. Fuel tank rupture could result in fuel spillage and a hazardous condition. Don’t crank the starter more than 30 seconds at a time during any of the following procedures; wait 2 minutes after each try to allow the starter to cool, or starter damage may occur. 3. On Caterpillar engines, if the engine isn’t equipped with a priming pump, use the same procedure as for Mercedes-Benz engines. 1. On MBE900 engines, use the following proce- dure: 1.1 Make sure that all high-pressure lines have been tightened to 18 lbf·ft (25 N·m) and all banjo bolts to 37 lbf·ft (50 N·m).

CAUTION Correct torque on the high-pressure lines is criti- cal. Incorrect torques could result in leaks or lack of power due to restricted fuel flow. 1.2 If equipped with a hand pump on the fuel/ water separator, work the hand pump 50 times. NOTE: There should be a strong resistance in the hand pump, caused by the pressure build-up within the fuel system. 1.3 Crank the engine for 30 seconds at a time, but no longer. Before cranking the engine again, wait at least two minutes. The engine should start within four 30- second attempts. 1.4 If the engine still does not start, open the high-pressure lines and bleed the air from the fuel system while cranking.

Tighten the high-pressure lines and repeat the priming procedure. Business Class M2 Workshop Manual, Supplement 1, April 2002 140/1