Freightliner — Freightliner Business Class M2 Workshop Manual

Aftertreatment System, EPA07 49.01 EPA07 Aftertreatment System Bellows Replacement 1 A 1 2 C 2 B B C f490317 02/28/2008 A. Up-and-down adjustment to be done at this bracket. B. Vertical measurements to be the same. C. Horizontal (in-and-out) measurements to be the same. 1. ATD Inlet Pipe 2. Turbo Outlet Pipe (support bracket not shown) Fig. 2, Rotation and Adjustment Areas for Exhaust Pipe alignment (vertical ATD installation shown) 24. Start the engine and check for leaks. Shut down the engine, and tighten any clamps as needed. Business Class M2 Workshop Manual, Supplement 16, September 2009 110/3