Freightliner — Freightliner Business Class M2 Workshop Manual

Aftertreatment System, EPA10 49.02 Bellows Replacement 10.3 Slide the new bellows onto the ATD inlet pipe. 10.4 Position the slip-joint clamp over the gas- kets. Do not tighten at this time. 11. Position the bellows and ATD inlet pipe assembly on the vehicle. 12. Slide the ATD inlet pipe in or out of the bellows to align it with the ATD inlet. 13. Install the new spherical clamp and gasket at the ATD inlet. Do not tighten at this time. 14. Install the new spherical clamp and gasket at the bellows-to-the turbocharger outlet-pipe connec- tion. Do not tighten at this time. 15. If removed, install the ATD-inlet-pipe support bracket on the framerail. 16.

Install the turbocharger-outlet-pipe support bracket clamp. Do not tighten at this time. 17. Install ATD-inlet-pipe support bracket clamp. Do not tighten at this time. 18. Using a straight edge, align the bellows, the ATD inlet pipe, and the turbocharger outlet pipe. Check from at least two positions about 90 de- grees apart. All three components should form a straight line through the connections. 19. Tighten the spherical clamp at the turbocharger outlet pipe connection 126 to 138 lbf·in (1425 to 1560 N·cm). 20. Tighten the spherical clamp at the ATD inlet con- nection 126 to 138 lbf·in (1425 to 1560 N·cm). 21.

Tighten the slip-joint clamp at the ATD inlet to bellows connection 13 lbf·ft (18 N·m). 22. Tighten the turbocharger-outlet-pipe support bracket clamp 24 lbf·ft (30 N·m). 23. Tighten the ATD-inlet-pipe support bracket clamp 24 lbf·ft (30 N·m). 24. Start the engine and check for leaks. Further tighten the clamps on any leaking connections as needed. 25. Install the inner fender/splash shield. Business Class M2 Workshop Manual, Supplement 17, March 2010 100/2