Aftertreatment System, EPA10 49.02 Cummins ISB/ISC Under-Step Switchback SCR Catalyst Removal and Installation 7. Tighten the spherical clamps at the SCR catalyst inlet and the mixer tube 126 to 138 lbf·in (1425 to 1560 N·cm). 8. Tighten the exhaust pipe clamp at the outlet of the SCR catalyst 45 to 60 lbf·ft (60 to 80 N·m). 9. Install the NOx sensor module on the bracket on the frame rail, then connect it to the chassis har- ness. 10. Connect the wiring harness to the control box on the SCR catalyst. 11. Start the engine and check for exhaust leaks. Further tighten the clamps on any leaking con- nections as needed. 12. Install the steps. 13. Install the inner fender.
Business Class M2 Workshop Manual, Supplement 17, March 2010 120/3