Freightliner — Freightliner Business Class M2 Workshop Manual

Aftertreatment System, EPA10 49.02 Cummins 2HH ATD Removal and Installation 6. Connect the ATD outlet to the mix tube and in- stall the new spherical clamp and gasket. Do not tighten at this time. 7. Recheck the alignment of all components. Make adjustments to the mounting straps (and brackets) as needed then incrementally tighten the bolts 15 lbf·ft (20 N·m), them 30 lbf·ft (41 N·m). 8. Tighten the spherical clamps at the connections to the ATD inlet pipe and the mix tube 126 to 138 lbf·in (1425 to 1560 N·cm). 9. Connect the wiring harnesses to the control mod- ule on the ATD. 10. Remove the jack and cradle. 11. Start the engine and check for leaks.

Further tighten the clamps on any leaking connections as needed. Business Class M2 Workshop Manual, Supplement 17, March 2010 130/2