Switch Expansion Module 54.16 Installation Installation 18. Install the trim plate panel on the dashboard. 1. Turn off the engine, apply the parking brakes, and chock the tires. 19. Connect the batteries. 20. After installing an SEM, turn the ignition on and use ServiceLink ® to connect to the vehicle. No- tice that the newly installed SEM appears in Ser- viceLink as a new SEM icon in the left side bar. One of the following situations may be encoun- tered. 2. Disconnect the negative leads from the batteries. 3. Remove the trim plate panel from the dashboard. See Fig. 1 . For instructions, see Sec- tion 60.08, Subject 100 . 4.
Disconnect the dome light switch at the right dash panel, then remove the right dash panel. If the serial number of the new SEM is lower than those already on the vehicle, it claims source address 128 and appears as SEM #1. 5. Remove the top cover from the dashboard. NOTE: If the vehicle has a Mercedes-Benz en- gine, a vehicle control unit (VCU) is mounted behind the right dash panel. If the serial number of the new SEM is higher than those already on the vehicle, it appears as the next SEM in numeric order. For example, if there are two SEMs al- ready on the vehicle appearing in Service- Link as SEM #1 and SEM #2, the new SEM appears in ServiceLink as SEM #3. 6.
If the vehicle is equipped with a VCU, lift the VCU off the mounting bracket and set it down. See Fig. 2 . 7. Remove the tie-straps as necessary to remove the VCU wiring harness from the mounting clip, and to access the capscrews on the mounting bracket. If the serial number of the new SEM is be- tween the serial numbers of SEMs already on the vehicle, the new SEM moves up the second SEM. The new SEM appears as SEM #2, and the SEM that was SEM #2 appears as SEM #3. Since SEM #1 still has the lowest serial number, it still ap- pears as SEM #1. 8. Remove the capscrews at the top and bottom of the mounting bracket, then remove the mounting bracket. 9.
For instructions on installing a smart switch, see Section 54.14, Subject 100 . If there are already three SEMs on the ve- hicle, the installation of a fourth SEM causes an Invalid ECU (duplicate) Un- able to claim address icon to appear in ServiceLink since no more than three SEMs can be installed on a vehicle. The fourth SEM should show a source address of 254. NOTE: To identify an SEM, go into the SEM icon in ServiceLink. Click on the Smart Switches tab and use the Identify SEM button to flash the indicator lights of the smart switches connected to that particular SEM. This makes it possible to locate the SEM and to see which smart switches are connected to which SEM. 10.
Using four capscrews, install the Switch Expan- sion Module (SEM) to the mounting bracket. 11. Using four capscrews, install the mounting bracket. 12. If the vehicle is equipped with a VCU, mount the VCU on the mounting bracket. 13. Overlay the SEM wiring harness on the main cab harness. Connect one connector of the harness to the Bulkhead Module (BHM), one connector to the smart switch, and two connectors to the SEM. 14. Use tie-straps as necessary to secure the SEM harness to the main cab harness. 15. Use tie-straps as necessary to secure the VCU wiring harness. 21. Remove the chocks from the tires. 16. Install the top cover on the dashboard.
For in- structions, see Section 60.08, Subject 100 . 17. Install the right dash panel on the dashboard. Business Class M2 Workshop Manual, Supplement 10, September 2006 110/1