Freightliner — Freightliner Business Class M2 Workshop Manual

Power Distribution Module 54.17 Trailer PDM Removal and Installation (EPA07 and earlier) Removal 1. Turn off the engine, apply the parking brakes, and chock the tires. 2. Disconnect the negative leads from the batteries. NOTE: The trailer power distribution module is mounted in between the frame rails, on a bracket. See Fig. 1 . 3. Remove the nut and washer that attach the posi- tive lead to the trailer PDM battery power stud. Then remove the positive lead. See Fig. 2 . 4. Disconnect the electrical connectors from the trailer PDM. 5. Remove the nuts and washers that attach the trailer PDM to the mounting bracket, then re- move the PDM. Installation 1.

Using nuts and washers, attach the PDM to the mounting bracket. 2. Attach the electrical connectors to the trailer PDM. 11/29/2010 f545706 1. Trailer PDM 2. Chassis Module Fig. 1, Typical EPA07 Trailer PDM (deck plate removed) 3. Using a nut and washer, install the positive lead on the trailer PDM battery power stud. Torque the nut 11 to 13 lbf·ft (15 to 18 N·m). Apply di- electric red enamel to protect the power connec- tion. 4. Connect the batteries. 5. Remove the chocks from the tires. Business Class M2 Workshop Manual, Supplement 19, March 2011 130/1 2 1