Power Distribution Module 54.17 Powernet Distribution Box Removal and Installation Removal 1. Disconnect all batteries. If the vehicle is equipped with an auxiliary battery bank, discon- nect these batteries as well. 2. Open the hood. NOTE: The powernet distribution box (PNDB) is located on the cab frontwall, next to the bulk- head module. See Fig. 1 . 3. Disconnect the battery and power cables from the PNDB. See Fig. 2 . 4. Disconnect the cab load disconnect switch (CLDS) connecter, if equipped. IMPORTANT: Inspect the keep-alive and CLDS connectors and make sure that the plugs are in unused connector cavities. Install plugs to seal the connector if any are missing. 5.
Disconnect the keep-alive circuit connector from the PNDB. 5.1 Using a flat-head screwdriver, push the red locking tab up. 5.2 Press and release the tab, then remove the connector. 6. Remove the two mounting nuts. 7. Remove the PNDB from the vehicle. 11/24/2010 f545704 1. Bulkhead Module 2. PNDB 3. Main PDM 4. Powertrain PDM Installation Fig. 1, Power Distribution Modules (EPA10 shown) 1. Position the PNDB on the frontwall, and attach the two mounting nuts. 2. Connect the battery and power cables. 3. Attach the keep-alive circuit connector and the CLDS connector. 4. Connect the batteries. 5. Close the hood. Business Class M2 Workshop Manual, Supplement 20, September 2011 150/1 1 2 3 4