Body Builder Lighting Interfaces 54.35 Marker Light Connections 7. Connect circuit 46F to cavity A of the 2-pin con- nector of jumper harness A06-19868-073. Marker Light Junction Block 8. Remove the seal plug from cavity B of the 2-pin connector of jumper harness A06-19868-073, and connect jumper harness A06-19868-074 to the cavity. See Fig. 5 and Fig. 6 . 1. Turn off the engine, apply the parking brakes, and chock the tires. 2. Disconnect the negative leads from the batteries. NOTE: The Chassis Module (CHM) is located on a bracket behind the back-of-cab crossmem- ber (standard location) or underneath the cab on the driver side.
For CHM location and con- nector identification, see Subject 400 . 9. Splice additional marker lights to the blunt-cut wire of harness A06-19868-074 using solder and heat-shrink tubing. 1 3. Find the junction block attached to the frame rail near the CHM. See Fig. 6 . 2 4. Remove the capscrews that attach the junction block cover to the junction block, and remove the cover. Then find the marker light feed at the yel- low wire. 5. Using an appropriate ring terminal, connect the marker light circuit to the junction block. IMPORTANT: The combined maximum allow- able load at the chassis module must not ex- ceed 10 amps . 5 3 4 6.
Use an appropriately sized inline fuse to provide proper circuit protection to the marker light cir- cuit. 09/11/2001 f543900 1. C1, Tail Harness 2. C2, Trailer Module Harness 3. C3, Forward Chassis Harness 4. C4, Forward Chassis Harness 5. C5, Air Management Unit 7. Properly install and route the marker light circuit. 8. Using capscrews, attach the junction block cover to the junction block. Fig. 2, Chassis Module Connections 9. Connect the batteries. IMPORTANT: The combined maximum allow- able load at the chassis module must not ex- ceed 10 amps.
The A06-19868-074 harness in- cludes an inline fuse to ensure that the total load for the circuit doesn’t exceed the maximum allowable 10 amps including the existing con- nected load which is normally 0.7 amps. If greater amperage is required, use the blunt-cut wire to trigger a relay with the power source coming from a separate fused battery supply. 10. Verify the operation of the marker lights. 11. Remove the chocks from the tires. Marker Light Splice 1. Turn off the engine, apply the parking brakes, and chock the tires. 2. Disconnect the negative leads from the batteries. NOTE:
The Chassis Module (CHM) is located on a bracket behind the back-of-cab crossmem- ber (standard location) or underneath the cab on the driver side. For CHM location and con- nector identification, see Subject 400 . 10. Properly install and route the marker light circuit. 11. Connect the batteries. 12. Verify the operation of the marker lights. 3. Find pin M of the CHM electrical connector C4. 13. Remove the chocks from the tires. Business Class M2 Workshop Manual, Supplement 13, March 2008 110/2