Freightliner — Freightliner Business Class M2 Workshop Manual

Body Builder Lighting Interfaces 54.35 Marker Light Connections 1 2 3 11/16/2005 f544657 1. Junction Block Cover 2. Junction Block 3. Chassis Module Fig. 6, Junction Block Location 4. Pull back the wire loom to expose a sufficient length of circuit 46F to allow for splicing. 5. Splice within 6 to 8 inches (150 to 200 mm) of the CHM using appropriate waterproof methods. IMPORTANT: The maximum allowable load from the vehicle chassis marker lights, combined with the added load of the body marker lights, must not exceed 10 amps . 6. Use an appropriately sized inline fuse to provide proper circuit protection to the marker light cir- cuit. 7. Properly install and route the marker light circuit.

Using electrical tape, wrap the harness bundle at least 2 inches (51 mm) on both sides of the splice connection, and wrap the added circuit at least 2 inches (51 mm) beyond the splice point to protect the marker light circuit. To reduce the chance of abrasion, cut a small notch in the wire loom where the added circuit leaves the loom. Install the wire loom over the harness bundle. 8. Connect the batteries. 9. Verify the operation of the marker lights. 10. Remove the chocks from the tires. Business Class M2 Workshop Manual, Supplement 13, March 2008 110/4