. OPERATION MACHINE OPERATIONS AND CONTROLS BUCKET REPLACEMENT WARNING 2. Align the arm with holes (1) and the link with holes (2), then coat with grease and install pins (A) and (B). pin. 3 - 80 When pins are knocked in with a hammer, pieces of metal may fly and cause serious injury. When carrying out this operation, always wear goggles, hard hat, gloves, and other protective eq When the bucket is removed, pla If pins are hit with a strong force, t here is a hazard that the pin may fly ou t and injure people in the s urrounding area. Make sure that there is no one in the surrou nding area before starting the operation. When removing the pins, do not st and behind the bucket.
In addition, be extremely careful not to pu t your foot under the bucket while standing at the side for the work. be extremely careful not to get your fingers caught. pin holes when aligning the holes. When removing or inserting pins, be extremely careful not to get your f Never insert your fingers into the NOTICE After removing the pins, make sure that mud or sand does not get on them. Dust seals are fitted at both ends of the bushings, so be careful not to damage them. Stop the machine on a firm and fl at surface and do the work. When performing joint work, appoint a c onductor and follow that person's instructions and signals. 1. Place the bucket in contact w (A) and (B). 1.
Place the bucket in contact w ith a flat surface, then pull out pins REMARK When removing the pins, pla contact with the ground. If the bucket is lowered stron will be increased and it will be ce the bucket so that it is in light gly to the ground, the resistance If the bucket is lowered stron will be increased and it will be difficult to remove the pins. ck the number of shims used to ssary when assembling again. When removing the pin, che adjust the play. This is nece REMARK When installing the bucket, th e O-rings are easily damaged, so fit the O-rings on the boss diagram.
of the arm end as shown in the e the O-ring down to the regular to adjust the play have been When knocking the pin, mov groove. Check that the shims used inserted. 3. Install the stopper bolts and nuts for each pin, then grease the