Komatsu — MEASUREMENT OF OIL LEAKAGE AMOUNT

TESTING AND ADJUSTING MEASUREMENT OF OIL LEAKAGE AMOUNT MEASUREMENT OF OIL LEAKAGE AMOUNT 1. Measurement of oil leakage amount from boom cylinder 1) Start the engine and keep it running until the hydraulic oil temperature rises to the operat- ing range. Then extend the boom cylinder to the stroke end. 4) Continue this condition for 30 seconds, then measure the oil leakage amount for one minute. k Release the pressure remaining in the pip- ing, referring to the foregoing section of "Release of Remaining Pressure in Hydrau- lic Circuit". 2) Disconnect hose (1) at the cylinder head end and block the hose end with a plate. k Be careful not to disconnect the hose at the cylinder bottom end.

3) Start the engine and apply the relief pres- sure to the bottom end of the cylinder with the engine running at high idling. 4) Continue this condition for 30 seconds, then measure the oil leakage amount for one minute. 5) After the measurement, make sure that the machine is back to normal condition. 3. Measurement of oil leakage amount from bucket cylinder 1) Start the engine and keep it running until the hydraulic oil temperature rises to the operat- ing range. Then extend the bucket cylinder to the digging stroke end. k Release the pressure remaining in the pip- ing, referring to the foregoing section of "Release of Remaining Pressure in Hydrau- lic Circuit".

2) Disconnect hose (3) at the cylinder head end block the hose end with a plate. k Be careful not to disconnect the hose at the cylinder bottom end. 3) Start the engine and apply the relief pres- sure to the bottom end of the cylinder with the engine running at high idling. 4) Continue this condition for 30 seconds, then measure the oil leakage amount for one minute. 5) After the measurement, make sure that the machine is back to normal condition. 2. Measurement of oil leakage amount from arm cylinder 1) Start the engine and keep it running until the hydraulic oil temperature rises to the operat- ing range. Then extend the arm cylinder to the digging stroke end.

k Release the pressure remaining in the pip- ing, referring to the foregoing section of "Release of Remaining Pressure in Hydrau- lic Circuit". 2) Disconnect hose (2) on the cylinder head end and block the hose end with a plate. k Be careful not to disconnect the hose at the cylinder bottom end. 3) Start the engine and apply the relief pres- sure to the bottom end of the cylinder with the engine running at high idling. 5) After the measurement, make sure that the machine is back to normal condition. 20-142 PC210/240-7K