Komatsu — SWING MOTOR AND SWING MACHINERY ASSEMBLY

DISASSEMBLY AND ASSEMBLY SWING MOTOR AND SWING MACHINERY ASSEMBLY 12 REMOVAL AND INSTALLATION OF SWING MOTOR AND SWING MACHINERY ASSEMBLY REMOVAL When lifting off the swing motor and swing machinery assembly for removal, do so slowly so that the hoses and other parts may not be dam- aged. Release the residual pressure in the hydraulic cir- cuit. Refer to the Release of Remaining Pressure in Hydraulic Circuit section in the TESTING AND ADJUSTING chapter of this manual. Lower the work equipment to the ground for safety. After stopping the engine, loosen the oil filler cap on the fuel tank to release the residual pressure inside the tank and move the safety lock lever to the LOCK position.

Swing motor and swing machinery assembly: 230 kg 1. Remove the mounting bracket for hose clamp (1). Keep the removed mounting bracket away from the swing motor and swing machinery assembly. 2. Disconnect six swing motor hoses (2) through (7). (2): Between the swing motor and control valve (MA port) (3): Between the swing motor and control valve (MB port) (4): Suction hose (S port) (5): Pilot hose for relieving swing brake (B port) (6): Between the drain hose and swing motor, and swivel joint (T port) (7): Between drain hose and swing motor, and hydraulic tank (T port) INSTALLATION Install in reverse order of removal. Swing motor and swing machinery assem- bly mounting bolt:

490 - 608 Nm (50 - 62 kgm) 3. Remove 12 mounting bolts (8). Refilling hydraulic oil Refill hydraulic oil through the oil filler port to the specified level. Let the oil circulate in the hydraulic system by starting the engine. Then check the oil level again. Air bleeding Refer to the Air Bleeding of Various Parts section in the TESTING AND ADJUSTING chapter of this manual. 4. Lift off swing motor and swing machinery assembly (9) to remove. PC210/240-7K 30-41