DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT ASSEMBLY 12 REMOVAL AND INSTALLATION OF ASSEMBLY WORK EQUIPMENT ASSEMBLY SPECIAL TOOLS Remove the boom cylinder on the other side in the same manner. 5. Disconnect bucket cylinder hoses (6) and arm cylin- der hoses (7), two for each. Plug the hoses to prevent oil flow-out, and fasten them on the valve side. *Distinction between new and existing part. 6. Disconnect intermediate connector CN-A42 (8) for a working lamp. REMOVAL Extend the arm and bucket fully. Lower the work equipment to the ground and set the safety lock lever to the lock position. Release the residual pressure in the hydraulic cir- cuit.
Refer to the Release of Remaining Pressure in Hydraulic Circuit section in the TESTING AND ADJUSTING chapter of this manual. 1. Disconnect grease hose (1). 2. Sling boom cylinder assembly (2), and remove lock bolt (3). 7. Lift off the work equipment and remove plate (9) and then pin (10) at the foot. 3. Remove plate (4), then remove head pin (5). There are shims installed, so check the number and thickness, and keep them in a safe place. When removing them, first remove plate (9) and then remove pin (10) at the foot, using Tool R . Shims are installed, so do not forget to check their number and each location of installation. 4. Start the engine and retract the piston rod.
Fasten the piston rod with wire so that it will not slip out and lower the cylinder onto a stand, or place a support under the bottom of the cylinder to support it. In the latter case, remove the grease fitting on the bottom side first. PC210/240-7K 30-87 Mark Part No. Part Name Necessity Qty Distinc- tion* Sketch R 796-900-1200 Remover ■ 1 790-101-4000 Puller (490 kN 50-T-long) ■ 1 790-101-1102 Pump (294 kN 30 T) ■ 1