Komatsu — COUNTERWEIGHT ASSEMBLY

DISASSEMBLY AND ASSEMBLY COUNTERWEIGHT ASSEMBLY 12 REMOVAL AND INSTALLATION OF ASSEMBLY COUNTERWEIGHT ASSEMBLY REMOVAL INSTALLATION 1. Attach eyebolts b to counterweight assembly (1), and sling. Install in reverse order of removal. 2. Remove 4 mounting bolts (2) Thread of counterweight mounting bolt: Thread tightener (LT-2) 3. Lift off counterweight (1) horizontally with wire or chain block. Counterweight mounting bolt: 1,180 - 1,470 Nm {120 - 150 kgm} Be careful not to it the engine, radiator or cooler. Counterweight assembly: 3,750 kg Installing and adjusting counterweight 1) Sling counterweight with crane and place in position on the frame.

2) Push counterweight, install mounting bolts, and adjust to the following dimensions. Clearance from revolving frame: 10 ± 5 mm (left and right) Clearance from bodywork door: 10 ± 5 mm (left and right) Stepped difference b from revolving frame in left-to right direction: Max. 5 mm Stepped difference a from bodywork door in left-to right direction: 10 ± 4 Stepped difference c from bodywork top cover in up-down right direc- tion: Max. 5 mm PC210/240-7K 30-93