. OPERATION TRANSPORTATION suddenly at the the machine is pass the until the machine 3 - 120 UNLOADING 1. Load and unloa d on firm level ground only. M aintain a safe distance from the edge o 2. Apply the traile r brakes securely, then put blo tires to prevent Set left and equally spac Make angle ramps ben machine, pu bending. tires to prevent the trailer from moving. right ramps (2) parallel to Set left and ed to the left and right of cente of installation (4) a maximu d a large amount under th t blocks under the ramps to p 3. Remove the ch ains and wire ropes fastening 4. Start the engin Warm the engi 5.
Set main work equipment lock lever to FREE raise the work (When transpo rting with work equipment inst 6. Set parking bra ke lever to the FREE position 7. Set the transmi ssion in the 1st gear and run idle. 8. Set the travel d irection toward the ramps and 9. The center of gravity of the machine shifts border betwee n the ramps and trailer, and d becomes dangerous. Acco ramps slowly and carefully u ps perfectly. unbalanced an border slowly. 10. Drive down the leaves the ram PRECAUTIONS FOR LOADING on of the trailer, secure it according to the following procedure. nt lock lever. ition. topping the engine, then remove the key. covers, and the battery inspection cover.
to prevent the machine from moving during transportation, and of suitable strength. in position so it does not slip to the side. After placing the m achine on the specified positi on of the trailer, secure it according to th e following procedur 1. Lower the work equipment slowly. 2. Secure control levers with the work equipme 3. Set the parking brake lever to the LOCK pos 4. Turn the startin g switch to the OFF position s topping the engine, then remove the ke 5. Lock the cab d oor, left and right engine side covers, and the battery inspection cover 6. Place blocks u nder both ends of the tracks secure the mac hine with chains or wire rope of suitable strength.
Be particulary careful to secure the machine in position so it does not slip to the side