. ATTACHMENTS, OPTIONS EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER PUSHING-UP SOIL REMARK position. 6 - 10 1. 2. 3. 1. Dig (A) wi th STRAIGHT PITCH (1). e REAR PITCH (2). WARD PITCH (3). . ver the top of the blade, change to STRAIGHT PITCH (1). RD PITCH (3). tively, and less soil is carried back. When dig ging gradually (A), us e REAR PITCH (2). If the grou nd is hard, use FOR 2. Haul (B) with REAR PITCH (2) If there is any spillage of soil o ver the top of the bla de, change to STRAIGHT 3. Dump the soil (C) with FORWA RD PITCH (3). This dum ps the soil more effec tively, and less soil i s carried LEVELING (SPREADING) OPERATION Carry out this operation with R itch.
Carry out this operation with R itch When carry o ut this operation with R pitch, the end bit d oes not dig in , round can be leveled ( or the soil can be spread If the tilt cylin der is moved complet ely to the end of its stroke, the til t operation cannot be carried o move the cylinder back