Komatsu — 12.3 OPERATIONS AND CHECKS AFTER STARTING ENGINE

12. OPERATION 12. OPERATION 3. Set the safety lock lever 3 to the FREE position, and raise the bucket from the ground. Lock Free 4. Operate bucket control lever 4 and arm control lever 5 slowly to move the bucket cylinder and arm cylinder to the end of the stroke. AM090430 Arm operation Bucket operation DUMP OUT CURL IN AM090440 5. Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm operation at 30 second intervals. Left swing ON Right swing NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. AM090450 6.

After carrying out the warming-up operation, check that each gauge and monitor lamp is in the following condition. Radiator water level monitor 7 : OUT Engine oil level monitor 8 : OUT Hydraulic oil level monitor 9 : OUT Charge level monitor 0 : OUT Fuel level monitor A : OUT Engine water temperature monitor B : OUT Engine oil pressure monitor C : OUT Engine water temperature gauge D : Inside green range Fuel gauge E : Inside green range Engine pre-heating monitor F : OUT Air cleaner clogging monitor G : OUT Hydraulic oil temperature monitor H : OUT Engine oil change monitor (set machine only) I : OUT 7. Check that there is no abnormal exhaust gas color, noise, or vibration.

If any abnormality is found, repair it. 8. Press working monitor mode switch 2 until required operation mode lamp is turned on. 2-49