23.
MAINTENANCE SCHEDULE CHART 23.1 MAINTENANCE SCHEDULE CHART SERVICE ITEM PAGE INITIAL 100 HOURS SERVICE (only after the first 100 hours) Clean strainer of P.T.O lubricating oil filter 3-23 INITIAL 250 HOURS SERVICE (only after the first 250 hours) Replace fuel filter cartridge 3-23 Change oil in swing machinery case 3-23 Change oil in P.T.O case 3-23 Change oil in final drive case 3-23 Check engine valve clearance, adjust 3-23 WHEN REQUIRED Check, clean and replace air cleaner element 3-24 Clean inside of cooling system 3-26 Check and tighten track shoe bolts 3-30 Check and adjust track tension 3-31 Check electrical intake air heater 3-33 Replace bucket teeth (horizontal pin type) 3-34 Adjust bucket clearance 3-35 Check window washer fluid level, add fluid 3-36 Check and maintenance air conditioner (only for machines equipped with air conditioner) 3-37 Clean line filter, remove dirt 3-38 Check APS (automatic priming system) 3-39 CHECK BEFORE STARTING Check coolant level, add water 3-40 Check oil level in engine oil pan, add oil 3-40 Check fuel level, add fuel 3-41 Check oil level in hydraulic tank, add oil 3-42 Check oil level in swing machinery case, add oil 3-43 Check oil level in P.T.O case, add oil 3-43 3-19