John Deere 700H Crawler Dozer — Remove and Install Wear Strips

Remove and Install Track Frame Wear Strips and Slide Guides. Track System 01 0130 70 T133358 –UN–21NOV00 1—Track Frame 3—Track Front Chain Guide 4—Idler Wear Strip mm (0.24 in) Fillet Weld x 8 mm (0.20 x 0.32 in.) Slide Bevel Weld 1. Remove front idler. (See Remove and Install Front Idler in this group.) Before welding, clean all dirt and paint from the weld areas and turn battery disconnect switch to OFF. Connect the welder ground clamp close to each weld area so electrical current does not pass through any bearings. 2. Remove wear strips (4). 3. Grind track frame wear strip surfaces smooth. Area must be free of any weld spatter. 4. If removing chain guide slide remove track frame.

(See procedure in this group.) 7. If track frame is still on machine, make sure the battery disconnect switch is turned to the OFF position. 5. Remove slide (3). 8. Clamp wear strip or guide slide in position. 6. Grind area surface smooth. IMPORTANT: Good welds are important. Have only a qualified welder do the procedure. Use E7018 electrodes. 9. Weld each wear strip or guide slide as indicated using E7018 electrodes. TM1859 (14JUL04) 01-0130-70 700H Crawler Dozer Continued on next page CED,TX03399,5966 –19–10NOV00–1/2 071404 PN=120