John Deere 700H Crawler Dozer — Disassemble and Assemble

Axle Shaft, Bearings, and Reduction Gear 54. Place dial indicator at the center of retaining cap and adjust to zero. 55. Lower final drive so axle shaft flange is level with weight of drive on axle flange. Stabilize final drive with wood blocks. T133338B –UN–21AUG00 56. Dial indicator will show amount of axle shaft end play. 57. Remove retaining plate and enough shims to eliminate measured end play. Then remove additional shims to provide the specified preload. 02 0250 12 Final Drive—Specification Axle Shaft—Preload 0—0.127 mm (0.0—0.005 in.) ................................... 58. Apply cure primer and thread lock to retainer cap screws. Tighten cap screws to specification.

Final Drive—Specification Axle Retainer Cap—Torque 319 (235 lb-ft) ........................................ CED,TX03399,5970 –19–24MAR00–25/26 59. Apply threadlock to axle cover (1) and cap screws (2). Tighten cap screws to specification. Final Drive—Specification Axle Cover Plate—Torque 73 (54 lb-ft) ............................................... 60. Install park brake and hub. (See Remove and Install Park Brake in Group 1160.) 1—Axle Cover Plate 2—Cap Screw T133335B –UN–21AUG00 CED,TX03399,5970 –19–24MAR00–26/26 TM1859 (14JUL04) 02-0250-12 700H Crawler Dozer 071404 PN=142