Removal and Installation TM1859 (14JUL04) 03-0300-7 700H Crawler Dozer 071404 PN=151 Remove and Install Hydrostatic Pump CAUTION: Prevent possible injury from unexpected track movement. Raise the machine off the ground and support with blocks. Tracks MUST be free to rotate in either direction to –UN–03SEP98 perform Hydrostatic Pump Initial Startup Procedure and Pump Displacement Control Valve Neutral (Null) Adjustment. T116758B 1. Raise machine off the ground and support with floor stands. Lower blade to ground. Tracks MUST be free to rotate in either direction. 2. Turn battery disconnect switch to OFF. 3.
Remove access plate from bottom of hydrostatic reservoir compartment and drain reservoir. The –UN–21AUG98 approximate capacity of hydrostatic reservoir is 65.1 L (17.2 gal). 4. If equipped with heater, drain engine coolant. The T116757B approximate capacity of engine coolant is 19.4 L (20.5 qt). 5. Remove floor mat and floor access plate. A—Cap Screws Around Seat Box Bottom (4 used) B—Armrest 6. For machines with toolbox, pull out drawer and remove C—Shoulder Cap Screws (2 used) cap screw holding toolbox in place. Remove toolbox E—Knee Pad from machine. 7. Remove four cap screws (A) from around seat box bottom. 8.
Remove shoulder cap screws (C) from seat box under armrest (B) on both sides of seat. 9. Remove two cap screws from knee pad (E) on both sides of seat. IMPORTANT: Observe control levers as seat is being raised or lowered for possible interference. 10. Loosen jam nut on hydraulic control lever tee handle and index handle 90° to provide clearance for seat when tilting. Continued on next page CED,TX03399,5973 –19–24MAR00–1/15 03 0300 7