John Deere 700H Crawler Dozer — Remove and Install

Removal and Installation TM1859 (14JUL04) 03-0300-19 700H Crawler Dozer 071404 PN=163 Specification Hydrostatic Motor Mounting Cap Screws—Torque.......................................................... 210 N•m (155 lb-ft) 23. Remove hydrostatic motor removal and installation tools. 24. Connect hydrostatic lines and wiring connector. 25. Adjust Hydrostatic Motor Speed Sensor, if removed. (See Adjust Hydrostatic Motor Speed Sensor in this group. 26. Fill reservoir if drained. (See Transmission, Hydraulic, and Winch (If Equipped) Oil in Group 004 Fuels and Lubricants.) 27. Turn battery disconnect switch to ON. 28. Do Hydrostatic Pump and Motor Initial Start-Up Procedure.

(See Hydrostatic Pump and Motor Initial Start-Up Procedure in Operation and Test Manual, Group 9026-25.) 29. Calibrate transmission controller. See Calibrate Transmission Controller in group 9015-20 in Operation and Test Manual.) 30. Install rear access plate or rear mounted optional equipment. 31. Replace bottom access plates if removed. CED,TX03399,5974 –19–24MAR00–4/4 03 0300 19