Controls Linkage 57. Install four socket head cap screws (3) and tighten to specifications. Single Lever Control—Specification Single Lever Control Top Plate Cap Screws—Torque 19 (14 lb-ft) (168 lb-in.) .................................... 58. Install boot (2). 59. Install handle (1) and tighten lock nut to specifications. Single Lever Control—Specification Single Lever Control Handle Lock Nut—Torque 34 (25 lb-ft) .................................................................... T124637C –UN–27OCT99 60. Adjust single lever control. (See Single Lever Control "SLC" Adjustment in Operation and Test Manual, Group 9026-20.) 61. Recalibrate transmission controller.
(See Calibrate Transmission Controller in Operation and Test Manual, Group 9015-20.) 1—Handle 2—Boot 3—Socket Head Cap Screw (4 used) TM1859 (14JUL04) 03-0315-25 700H Crawler Dozer CED,TX03399,5977 –19–24MAR00–28/28 071404 PN=189 IMPORTANT: Tie bands MUST be installed and wire lead MUST be positioned in clamp between assembly marks to provide a loop in wiring harness for steering. 55. Install tie bands (1) on wire harness. 56. Install clamp (3). 17SEP99 –UN– T124638B CED,TX03399,5977 –19–24MAR00–27/28 03 0315 25