Hydrostatic System 11. Install gasket (A). IMPORTANT: Linkage pin (C) must be installed correctly into link (D) or swash plate will not move. 12. Install displacement control valve (B) to pump making sure neutral feedback linkage pin (C) installs correctly into feedback link (D). 13. Install and tighten the six cap screws to specifications. Hydrostatic Pump—Specification Displacement Control Valve-to-Hydrostatic Pump Cap Screws—Torque 16 (144 lb-in.) ........................................................... 03 0360 26 CAUTION: After the displacement control valve has been disassembled, the tracks could rotate when park lock lever is lowered until null adjustment is preformed.
RW25726 –UN–20JUN97 14. Perform Pump Displacement Control Valve Neutral (Null) Adjustment. (See Pump Displacement Control Valve Neutral (Null) Adjustment in Operation and Test Manual, Group 9026-25.) A—Gasket B—Displacement Control Valve C—Feedback Linkage Pin D—Feedback Link 15. Calibrate transmission controller. (See Calibrate Transmission Controller in Operation and Test Manual, Group 9015-20.) CED,OUO1008,149 –19–13APR99–3/3 Disassemble and Assemble Multi-Function Valve 1. Remove multi-function valves (A) from end cap. A—Multi-Function Valve (2 used) RW25776 –UN–21JUN97 TM1859 (14JUL04) 03-0360-26 700H Crawler Dozer Continued on next page CED,OUO1004,521 –19–26MAR99–1/3 071404 PN=216