Hydrostatic System 3. Carefully loosen cap (2) to release pressure on springs (7 and 12). Disassemble valve as shown. 4. Clean valve components and check for any contamination. NOTE: Other than O-rings, multi-function valve components are not serviceable. 5. If any valve components are damaged, replace the entire valve. T119706B –UN–20JAN99 6. Lubricate valve components with clean hydraulic oil. 7. Assemble multi-function valve. Use a vise to carefully press poppet assembly onto valve body. Tighten lock nut (1) to specification. 03 0360 28 Specification Multi-Function Valve Lock Nut— Torque 16.3 (144 lb-in.) .......................................................................
1—Lock Nut 2—Cap 3—Bypass Piston 4—O-Ring 5—Valve Housing 6—O-Ring 7—Spring 8—Spring Guide 9—Pressure Limiter Poppet 10—Guide 11—Washer 12—Spring 13—High Pressure Relief Valve Poppet 14—Check Valve Poppet 15—O-Ring 8. Check valve poppet movement in end of the multi-function valves. 9. Install and tighten multi-function valves to specifications. Hydrostatic Pump—Specification Multi-Function Valves—Torque 79 (58 lb-ft) ....................................... 10. Perform multi-function relief valve test. (See Multi-Function Relief Valve Test in Operation and Test Manual, Group 9026-25.) 11. Calibrate transmission controller.
(See Calibrate Transmission Controller in Operation and Test Manual, Group 9015-20.) CED,OUO1004,521 –19–26MAR99–3/3 TM1859 (14JUL04) 03-0360-28 700H Crawler Dozer 071404 PN=218