John Deere 700H Crawler Dozer — Multi-Function Valve, Disassemble and Assemble

Hydrostatic System 3. Carefully loosen cap (2) to release pressure on springs (7 and 12). Disassemble valve as shown. 4. Clean valve components and check for any contamination. NOTE: Other than O-rings, multi-function valve components are not serviceable. 5. If any valve components are damaged, replace the entire valve. T119706B –UN–20JAN99 6. Lubricate valve components with clean hydraulic oil. 7. Assemble multi-function valve. Use a vise to carefully press poppet assembly onto valve body. Tighten lock nut (1) to specification. 03 0360 28 Specification Multi-Function Valve Lock Nut— Torque 16.3 (144 lb-in.) .......................................................................

1—Lock Nut 2—Cap 3—Bypass Piston 4—O-Ring 5—Valve Housing 6—O-Ring 7—Spring 8—Spring Guide 9—Pressure Limiter Poppet 10—Guide 11—Washer 12—Spring 13—High Pressure Relief Valve Poppet 14—Check Valve Poppet 15—O-Ring 8. Check valve poppet movement in end of the multi-function valves. 9. Install and tighten multi-function valves to specifications. Hydrostatic Pump—Specification Multi-Function Valves—Torque 79 (58 lb-ft) ....................................... 10. Perform multi-function relief valve test. (See Multi-Function Relief Valve Test in Operation and Test Manual, Group 9026-25.) 11. Calibrate transmission controller.

(See Calibrate Transmission Controller in Operation and Test Manual, Group 9015-20.) CED,OUO1004,521 –19–26MAR99–3/3 TM1859 (14JUL04) 03-0360-28 700H Crawler Dozer 071404 PN=218