Hydrostatic System 9. Test right track motor speed sensor. (See Right Hydrostatic Motor Speed Sensor Test Group 9015-15.) 10. Route all wiring harnesses back to their original location and replace all tie bands that were removed. NOTE: Recalibrate whenever sensors are adjusted or replaced. CED,TX03399,5990 –19–15NOV00–2/2 Disassemble Hydrostatic Motor 03 0360 40 1. Thoroughly clean external surface of motor prior to disassembly. 2. Remove four internal hex screws (1) and pressure control pilot (PCP) from displacement control valve. T8512AD –UN–27JUN95 IMPORTANT: PCP is serviced as an assembly. DO NOT disassemble. 3.
Remove four internal hex screws (2) and motor displacement control valve from housing. 1—Internal Hex Screw 2—Internal Hex Screw 4. Remove motor speed sensor housing and sensor. Continued on next page CED,TX03399,5991 –19–28JUN02–1/11 TM1859 (14JUL04) 03-0360-40 700H Crawler Dozer 071404 PN=230