John Deere 700H Crawler Dozer — Disassemble

Hydrostatic System 8. Remove four internal hex screws (9) and cover (7) from end cap. 9. Remove flushing valve components (1—4). NOTE: If plug on either end of flushing valve is replaced, use the same length as removed. Early machines used a longer plug. T8517AF –UN–10JUL95 10. Remove operating charge relief valve (8). 11. Replace O-rings (1, 5, 6 and 10). 12. Install cover and screws. Tighten screws to specification. 1—O-Ring 2—Spring 3—Spring Seat 4—Spool 5—O-Ring 6—O-Ring 7—Cover 8—Operating Charge Relief Valve 9—Screw (4 used) 10—O-Ring 03 0360 Specification Hydrostatic Motor End Cap Cover Cap Screws—Torque 110 (81 lb-ft) .................................................... 42 13.

Install flushing valve components (1—4). Tighten plugs to specification. Specification Flushing Valve Plug—Torque 41 (30 lb-ft) ......................................... Continued on next page CED,TX03399,5991 –19–28JUN02–3/11 TM1859 (14JUL04) 03-0360-42 700H Crawler Dozer 071404 PN=232