John Deere 700H Crawler Dozer — Remove and Install

Remove and Install Oil Cooler Thermal Bypass Valve Hydrostatic System NOTE: Hoses removed for clarity. 1. Drain or apply a vacuum to hydrostatic reservoir. The approximate capacity of the hydrostatic reservoir is 65.1 L (17.2 gal). 2. Disconnect temperature sensor wire (3). 3. Disconnect hoses (1, 5, 6, 9, and 11). 4. Remove cap screws (8) and nuts (2). T120828B –UN–10APR99 03 0360 5. Remove oil cooler thermal bypass valve (7). 60 6. Disassemble and assemble thermal bypass valve as required. (See Disassemble and Assemble Oil Cooler Thermal Bypass Valve in this group.) 7. Install oil cooler thermal bypass valve (7) using cap screws (8) and nuts (2). Tighten cap screws to specification.

1—Left Hydrostatic Motor Tee Fitting-to-Oil Cooler Thermal Bypass Valve 2—Nut (2 used) 3—Temperature Sensor Wire 4—Tee Fitting 5—Oil Cooler Thermal Bypass Valve-to-Front Hydrostatic Pump Tee Fitting 6—Oil Cooler Thermal Bypass Valve-to-Oil Cooler Inlet 7—Oil Cooler Thermal Bypass Valve 8—Cap Screws (2 used) 9—Oil Cooler Outlet-to-Oil Cooler Thermal Bypass Valve 10—Tee Fitting 11—Oil Cooler Thermal Bypass Valve-to-Reservoir Specification Oil Cooler Thermal Bypass Valve Mounting Cap Screws—Torque 80 (60 lb-ft) ...................................... 8. Install hoses (1, 5, 6, 9, and 11). 9. Install temperature sensor wire (3). 10. Fill reservoir if drained.

(See Operator’s Manual.) Specification Hydrostatic Reservoir—Capacity 65.1 L (17.2 gal) (Approximate) .............. CED,TX03399,5996 –19–15NOV00–1/1 TM1859 (14JUL04) 03-0360-60 700H Crawler Dozer 071404 PN=250