John Deere 700H Crawler Dozer — Remove and Install

Engine Speed Control 1—Grip 7—Notched Metal Washer (2 12—Yoke with Locking Collar 17—Cable 2—Upper Slider Plate used) 13—Nut (3 used) 18—Washer (2 used) 3—Lower Slider Plate 8—Cap Screw 14—Cap Screw 19—Angle Bracket 4—Spring 9—Throttle Lever 15—Washer 20—Washer 5—Washer 10—Spring Washer (5 used) 16—Clamp (2 used) 21—Cap Screw 6—Friction Disk Washer (2 11—Lock Nut used) 1. Lower equipment to the ground. 8. Tighten nut (11) to initiate a 67—76 N (15—17 lb) (force) movement on lever in the forward direction. 2. Remove left engine side shields. 3. Remove dash and foot rest.

Speed Control Lever—Specification Lever to Initiate Movement in Forward Direction—Force 67—76 N (15—17 lb) .................................. 4. Remove parts as required. 9. Adjust linkage. (See Engine Speed Control Linkage Adjustment in Operation and Test Manual, Group 9010-20.) 5. Install parts. 6. Install spring washers (10) with concave side toward notched metal washer (7). 10. Tighten ball stud nuts to specification. Speed Control Lever—Specification Speed Control Ball Stud Nut— Torque 11.1 (98 lb-in.) ................................................................... 7. Apply instant gel adhesive to throttle lever (9) and install grip (1).

Continued on next page 05 CED,TX03399,6017 –19–24MAR00–2/4 0515 3 TM1859 (14JUL04) 05-0515-3 700H Crawler Dozer 071404 PN=295