Remove and Install Transmission Controller System Controls 1. Turn battery disconnect switch to "OFF". 2. Remove transmission controller cover. 3. Disconnect connectors (1 and 2). T133148B –UN–11AUG00 4. Remove four cap screws (3). 5. Install controller, strap and four cap screws. Tighten cap screws. Transmission Controller—Specification Controller Mounting Cap Screw and Ground Strap-to-Controller Cap Screws—Torque 6.8 (60 lb-in.) .................................................... 1—Connector 2—Connector 3—Cap Screw (4 used) 6. If ground strap-to-tank boss was removed, tighten cap screws to specification.

Transmission Controller—Specification Ground Strap-to-Boss on Tank Cap Screw—Torque 15.3 (135 lb-in.) .................................................. 7. Connect connectors. Install cover and turn battery disconnect switch to "ON". 8. Calibrate controller. (See Calibrate Transmission Controller in Operation and Test Manual in Group 9015-20.) CED,TX03399,6042 –19–29MAR00–1/1 Remove and Install Display Monitor 1. Turn battery disconnect switch to "OFF". 2. Remove two screws (1). 3. Remove monitor and disconnect two wire connectors . T132320B –UN–21JUL00 4. Connect wire connectors and install monitor. 5. Install screws and tighten.

16 1675 2 1—Screw TM1859 (14JUL04) 16-1675-2 700H Crawler Dozer CED,TX03399,6043 –19–29MAR00–1/1 071404 PN=376