John Deere 700H Crawler Dozer — Remove and Install

Remove and Install Compressor Heating and Air Conditioning 18 1830 26 T150179 –UN–18JAN02 1—Compressor 6—Sleeve 10—Cap Screw 14—Cap Screw (2 used) 2—Spring Pin (2 used) 7—Pulley 11—Cap Screw (2 used) 15—Cap Screw 3—Bracket 8—Cap Screw 12—Nut (3 used) 16—P-Clamp 4—Support 9—Washer (6 used) 13—Washer (2 used) 17—Cap Screw 5—Spacer 1. Remove refrigerant from the system. (See procedure in this group.) Support Bracket-to-Engine Block Cap Screw—Torque 120 (89 lb-ft) ..................................... Compressor Bracket to Engine Block Cap Screws—Torque 70 (52 lb-ft) .....................................

Idler pulley-to-fan drive cap screw—Torque 50 (37 lb-ft) .......................................................... 2. Loosen belt adjuster and remove belt. 3. Disconnect wiring lead, suction and discharge lines. 4. Remove four cap screws and compressor. 7. Connect suction and discharge lines and wiring lead. 5. Repair or replace compressor. (See procedure in this group.) 8. Install belt. 6. Install compressor and tighten cap screws. 9. Install a new receiver/dryer. 10. Evacuate and charge the system.

(See procedure in this group.) Air Conditioning Compressor Remove and Install—Specification Compressor-to-Bracket Cap Screws—Torque 35 (26 lb-ft) ....................................................... TM1859 (14JUL04) 18-1830-26 700H Crawler Dozer Continued on next page CED,TX03399,5020 –19–14JUN02–1/2 071404 PN=470