John Deere 700H Crawler Dozer — Hydraulic and Hydrostatic Reservoir Cleanout Cover Remove and Install (S.N. 925918— )

Hydraulic System 21. Install control valve, linkage and bellcrank, if removed. 22. Install hydraulic filter hose (4). 23. Install tube (2), bracket and solenoid (5). Tighten cap screws. T131074B –UN–17MAY00 24. Connect start aid wire connector (3), start aid tube (2). 1—Control Valve 2—Start Aid Tube 3—Start Aid Wire Connector 4—Hydraulic Filter Hose 5—Solenoid and Bracket CED,TX03399,6067 –19–17NOV00–7/8 25. Connect windshield washer pump wire connectors (1). 21 2160 18 26. Install cab or ROPS. (See procedure in Group 1800.) 27. Fill hydraulic reservoir. The approximate capacity of hydraulic reservoir is 51 L (13.5 gal).

(See Transmission, Hydraulic, and Winch (If Equipped) Oil in Fuels and Lubricants Section 00, Group 04.) T131071B –UN–17MAY00 1—Windshield Washer Pump Wire Connectors CED,TX03399,6067 –19–17NOV00–8/8 Hydraulic and Hydrostatic Reservoir Cleanout Cover Remove and Install (S.N. 925918— ) 1. Drain reservoir. See 700H Dozer Drain and Refill Capacities. (Operator’s Manual.) 2. Remove components as necessary to adequately access cleanout cover. Continued on next page BT40170,000000A –19–05MAR04–1/5 TM1859 (14JUL04) 21-2160-18 700H Crawler Dozer 071404 PN=526